Tag Archives: produced

Feasibility Study for Treatment of Produced Water, Oil and Gas Client, Orange County, California

The site is an active oil and natural gas production property that currently re-injects approximately 135,000 barrels per day (BPD) of produced water. As a result of limited reinjection capacity, the facility was required to treat and discharge up to … Continue reading

Posted in Advanced Oxidation, All Posts, Industrial Wastewater, Oil and Gas, Projects | Tagged , , , , | Comments Off on Feasibility Study for Treatment of Produced Water, Oil and Gas Client, Orange County, California